Offtake Energy

VIRTUAL POWER PLANTS

You're Already PayingFor Power You Don't Use.We'll Pay You For It.

Your contracted capacity is a stranded asset. Offtake puts a data center behind your meter.

We build it, own it and operate it. You don't lift a finger.

A co-located battery protects your load. Your operations never feel it.

Built for:

  • — Large Industrial Manufacturers with Contracted Excess Capacity
  • — Process Industries: Chemical, Refining, Metals, Paper & Pulp
  • — Utilities & Co-ops with Stranded Generation Assets

5–50MW

Site Capacity Range

<6 Mo

VPP Time to Power

<12 Mo

Grid Power Timeline

18 Mo

Colocation Power Timeline

THE OFFTAKE ADVANTAGE

Your Unused Capacity Is Already Worth Something. We Unlock It.

Large industrial customers contract for peak power they rarely hit. That gap between contracted capacity and actual load is money sitting on the table. Offtake Energy turns that stranded capacity into a revenue stream — without touching your operations, your equipment, or your team.

Pre-Permitted Power

Sites come with existing utility interconnection agreements, substations, and transmission access — purpose-built for operators in the 5–50MW range who need power now, not after a decade in the interconnection queue.

Three Power Pathways

VPP, grid power, and colocation power — each with a distinct timeline so you can match the right pathway to your project's schedule. Smaller operators deserve the same access to power that the big players take for granted.

Right-Sized for You

Parcels are sized for 5–50MW deployments — not hyperscale campuses. We serve regional colo providers, edge operators, and enterprise teams that the big utilities and big developers routinely overlook.

Shovel-Ready Infrastructure

Road access, grading, environmental clearances, and utility easements are already in place. Your team walks onto a site ready to build — not ready to permit.

Industrial facility with co-located data center infrastructure

HOW IT WORKS

Offtake Does Everything. You Just Get Paid.

You don't need to hire engineers, negotiate with utilities, or change anything about how you run your facility. Offtake handles the entire project — from design and permitting through construction, commissioning and ongoing operations.

  • Offtake identifies your excess contracted capacity
  • We design and permit a co-located data center behind your meter
  • A co-located battery isolates the data center load from your operations
  • Offtake builds, owns and operates the entire facility
  • You receive ongoing payments for your unused capacity

THE OPPORTUNITY

Your Facility Is Already the Infrastructure

Most large industrial customers already have the grid connection, the land, and the contracted capacity. The only thing missing is a partner who knows how to monetize it. That's Offtake.

Aerial view of large industrial facility with grid infrastructure

Behind-the-Meter Co-location

Data center placed on your existing footprint · No new grid connection required

Co-located data center at industrial facility

Battery-Isolated Load

Co-located battery · Your operations never feel the data center load

WHO THIS IS FOR

Built for Large Industrial Customers With Excess Capacity

If your facility contracts for more power than it consistently uses, you're carrying a cost that doesn't have to be a cost. Offtake works with large industrial customers across manufacturing, process industries, and energy to turn that gap into a revenue-generating asset — with zero operational burden on your side.

  • Large Manufacturers

    Automotive, aerospace, food & beverage, and heavy manufacturing facilities with contracted capacity above their average load.

  • Process Industries

    Chemical plants, refineries, metals, and paper & pulp operations with large, stable power contracts and variable actual consumption.

  • Utilities & Co-ops

    Generation assets or distribution infrastructure with stranded capacity that can support a behind-the-meter data center deployment.

  • Industrial Real Estate Owners

    Owners of powered industrial sites looking to add a revenue stream without changing the primary use of the property.

Industrial facility with co-located data center

WHY NOW

Data Center Demand Is at an All-Time High. Your Capacity Is the Answer.

AI inference and cloud computing are driving unprecedented demand for data center capacity — and the grid can't keep up. Behind-the-meter deployments at industrial sites are one of the fastest paths to new capacity. Large industrial customers who act now are positioned to capture long-term revenue from an asset they already own.

[X] years

Typical utility interconnection queue for new data center capacity

< 6 months

VPP pathway — behind-the-meter deployment at your existing site

[X] MW

Typical excess capacity range Offtake targets per industrial customer

$[X]/yr

Annual revenue per MW of capacity monetized (site-specific)

Data center construction at industrial site

GET IN TOUCH

Tell Us About Your Capacity

Share a few details about your facility and contracted power. We'll assess whether your site is a fit and follow up within one business day with a preliminary analysis — no commitment required.

WHAT HAPPENS NEXT

  • 01

    Capacity Assessment

    We review your contracted capacity, average load profile, and site characteristics.

  • 02

    Preliminary Fit Analysis

    Offtake determines whether your site qualifies and what capacity range is monetizable.

  • 03

    Term Sheet

    If it's a fit, we move to a term sheet outlining the revenue structure and project timeline.

  • 04

    Offtake Handles the Rest

    Design, permitting, construction, commissioning and operations — all on us.

No disruption to your operations. Ever.

The co-located battery system ensures the data center load is fully isolated from your facility's power supply. Your production, your equipment, and your team never feel it.

Offtake Energy

The Public-to-Private Power Transition Starts Here

Follow Us

Copyright © 2026 Offtake Energy - All Rights Reserved.

Privacy PolicyTerms of Use

Powered by GoDaddy